PANAMA CANAL - 5th Waypoint

 

Please use our A-Z INDEX to navigate this site, or visit HOME

 

The Panama Canal

 

 

The Panama Canal is an artificial 82 km (51 mi) waterway in Panama that connects the Atlantic Ocean with the Pacific Ocean. The canal cuts across the Isthmus of Panama and is a conduit for maritime trade. Canal locks are at each end to lift ships up to Gatun Lake, an artificial lake created to reduce the amount of excavation work required for the canal, 26 m (85 ft) above sea level, and then lower the ships at the other end. The original locks are 34 m (110 ft) wide. A third, wider lane of locks was constructed between September 2007 and May 2016. The expanded canal began commercial operation on June 26, 2016. The new locks allow transit of larger, post-Panamax ships, capable of handling more cargo.

France began work on the canal in 1881, but stopped due to engineering problems and a high worker mortality rate. The United States took over the project in 1904 and opened the canal on August 15, 1914. One of the largest and most difficult engineering projects ever undertaken, the Panama Canal shortcut greatly reduced the time for ships to travel between the Atlantic and Pacific Oceans, enabling them to avoid the lengthy, hazardous Cape Horn route around the southernmost tip of South America via the Drake Passage or Strait of Magellan.

 

 

 

 

 

Colombia, France, and later the United States controlled the territory surrounding the canal during construction. The US continued to control the canal and surrounding Panama Canal Zone until the 1977 Torrijos–Carter Treaties provided for handover to Panama. After a period of joint American–Panamanian control, in 1999, the canal was taken over by the Panamanian government. It is now managed and operated by the government-owned Panama Canal Authority.

 

Annual traffic has risen from about 1,000 ships in 1914, when the canal opened, to 14,702 vessels in 2008, for a total of 333.7 million Panama Canal/Universal Measurement System (PC/UMS) tons. By 2012, more than 815,000 vessels had passed through the canal. It takes 11.38 hours to pass through the Panama Canal. The American Society of Civil Engineers has ranked the Panama Canal one of the seven wonders of the modern world.

 

 

 

 

 

 

 

5TH LEG - The fifth leg of this zero carbon voyage is approximately 970 nautical miles including navigating the length of the Panama Canal. At a cruising speed of 7 knots this leg from Panama City to the Galapagos Islands would take 6 days to complete. At 6 knots the journey would take 7 days.

 

 

 

 

 

 

 

OCEAN AWARENESS - PROVISIONING & MEDIA STOPS

 

We are making allowance for nineteen (19) provisioning and Public Relations stops of three days duration each. This adds an extra 57 days to the expedition in the interests of furthering awareness objectives. Hence, the passage would not be an outright race, unless any consortium providing financial incentives decided not to stop for photo opportunities by way of a condition in accepting support. If a race was decided on, provisions for a 3-4 person crew would need to be stored on board. Being solar and wind powered there is no need for conventional refueling.

 

 

 

 

 

RECORD HOLDER - On the 4th of May 2012, history was made, as Raphael Domjan, at the helm of a giant of a catamaran powered only by solar panels crossed the finishing line at Monaco to become the first electric boat to sail around the world. MS Tūranor PlanetSolar, known under the project name PlanetSolar, was (@ 2018) the largest solar-powered boat in the world. The vessel was launched on the 31st March 2010, also going into the Guinness Book of World Records with a time of 584 days to better by any contender. The project was mostly financed by Immo Stroeher, the owner of the boat. Though a magnificent endeavour, PlanetSolar was not designed at the outset to take full advantage of energy from nature, but was rather a very much modified ferry design.

 

 

 

 

 

FOSSIL FUELS - The Cable and Wireless Adventurer was built for the purpose of circumnavigating the world in less than 80 days. This was successfully accomplished in July 1998 in 74 days, 20 hours, 58 minutes, traveling more than 22,600 nautical miles (26,000 miles or 41,855 km). This achievement set a new Guinness World Record for a diesel powered vessel. The nautical mile or knot, is a unit of speed equal to approximately 1.15078 miles per hour on land (1.852 km). Solar power cannot compete with diesel engines. This boat is though one of the links in the evolution, or archaeology of efficient hulls.

 

 

 

CIRCUMNAVIGATION MILESTONE EXPEDITION ESTIMATES

 

LEG

NAUTICAL MILES

TIME IN PORT

WAYPOINT

SUNSHINE DAYS

-

-

-

-

-

START

-

-

Monaco

0.00

1

784

2

Gibraltar

4.67

2

729

2

Tenerife, Canary Islands

4.34

3

3,154

2

Trinidad, Port of Spain

18.77

4

1,182

2

Panama City

7.04

5

970

2

Galapagos

5.77

6

3,640

2

Tahiti

21.67

7

1,423

2

Tonga, Nukualofa

8.47

8

410

2

Fiji, Suva

2.44

9

1,886

2

Port Moresby PNG

11.23

10

340

2

Thursday Island, Cape York

2.02

11

724

2

Darwin

4.31

12

1,572

2

Jakarta, Indonesia

9.36

13

1,881

2

Colombo, Sri Lanka

11.20

14

2,109

2

Aden, Yemen

12.55

15

698

2

Jeddah, Saudi Arabia

4.15

16

670

2

Port Said, Egypt

3.99

17

1,111

2

Palermo, Sicily

6.61

18

170

2

Naples, Italy

1.01

19

393

FINISH

Monaco

2.34

-

-

-

-

-

-

23,846

36

RUNTIME DAYS @ 7kts

141.94

-

-

-

-

-

+ 10% service

= 156.13 Days

-

7 KNOTS AVE INC PORT & %

192.13

-& maintenance

-

-

AT 6 KNOTS AVE

224.16

 -

-

-

AT 5 KNOTS AVE

268.99

 

 

 

Aft view of the Elizabeth Swann, probably the fastest solar boat design in the world

 

 

CLIMATE CHANGER - The above table illustrates one of the most likely ocean awareness expedition routes, known as the 'Sunshine Route,' showing the time elapsed in days for 7 knots average cruising speed, including times for 5 and 6 knot averages - allowing for 10% downtime and 36 days in ports. Hence, although the objective is to reduce the current solar circumnavigation record from 584 days, the event in not an outright non-stop yacht competition in the offshore racing sense. It remains to be seen how accurate such a prediction might be. In this table we only allowed 36 days for provisioning and PR but added a 10% contingency for servicing, that could be used for additional time in ports. As a Climate Changing event, performance is one of the main criteria, especially concerning the possibilities for a transition to low carbon shipping and the contribution this might make in combating global warming.

 

 

 

 

 

 

 

LINKS & REFERENCE

 

https://www.planetsolar.org/

http://www.guinnessworldrecords.com/world-records/first-circumnavigation-by-solar-powered-boat

 

 

 

 This website is provided on a free basis as a public information service. Copyright © Cleaner Oceans Foundation Ltd (COFL) (Company No: 4674774) 2024. Solar Studios, BN271RF, United Kingdom. COFL is a charity without share capital.

 

 

 

 

OCEAN AWARENESS CIRCUMNAVIGATION WORLD RECORDS EXPEDITION